Village Hall Committee Meeting Minutes – July 2019

Download

- Stars (0)

100 Downloads

Version: 1.0

Last Updated: 01-02-2020 13:52

Share
DescriptionPreviewVersions
AVH Minutes 15th July 2019.pdf

Village Hall Committee Meeting Minutes – September 2019

Download

- Stars (0)

174 Downloads

Version: 1.0

Last Updated: 01-02-2020 13:49

Share
DescriptionPreviewVersions
AVH Minutes 16th September 2019.pdf

Autumn Newsletter

Download

- Stars (0)

6 Downloads

Version: 1.0

Last Updated: 12-10-2019 16:42

Share
DescriptionPreviewVersions
Newsletter Autumn19.pdf

Accessible entrance – construction to start 30th September

Construction of the new ramp to provide an accessible entrance at the front of the Hall is expected to start on 30th September.  Work is expected to last 6-7 weeks, to allow for construction of the ramp and then installation of safety fencing and handrails.  The image above gives an idea of how the ramp will look, although the railings will be different to those shown.

The site will be fenced and a compound put in place at the front of the Hall. Work will only be carried out during daylight hours. We have asked our builders to do as much as they can to minimise any disruption to our neighbours and the wider community.

We would ask everyone to please bear with us during the construction process. Our builders know they need to be aware of the impact of the work on our neighbours, hall users and other members of the community, and we hope that any short term problems can be resolved with them on site.

We are looking forward to revealing our new entrance ramp soon – and ticking off the most requested item from our five year plan survey!

 

Alvechurch Village Hall – Bookings Policy

Download

- Stars (0)

29 Downloads

Version: 1.0

Last Updated: 23-09-2019 18:16

Share
DescriptionPreviewVersions
AVH Bookings Policy v1.pdf

Alvechurch Village Hall – General Operating Procedures

Download

- Stars (0)

23 Downloads

Version: 1.0

Last Updated: 23-09-2019 18:16

Share
DescriptionPreviewVersions
AVH_General_Operating_Procedures_v1.pdf

Pumpkin Festival Entry Form 2019

Download

- Stars (0)

114 Downloads

Version: 1.1

Last Updated: 11-08-2019 22:38

Share
DescriptionPreviewVersions

Alvechurch Village Hall Fire Safety Notice

Download

- Stars (0)

54 Downloads

Version: 1.0

Last Updated: 03-08-2019 15:44

Share
DescriptionPreviewVersions
Alvechurch Village Hall - Fire Safety Notice v 15 July 2019.pdf